Pipeline Commissioning

20.00 1 Comments






Pipeline commissioning means introducing crude/ product/Gas in the pipeline from originating station, filling the entire length and then start delivering to receipt system. 


Critical issues in commissioning a Petroleum Pipeline

  • Movement of hydrocarbon in empty pipeline can generate static current
  • Hydrocarbon Vapor mixed with oxygen may lead to explosion.
  • There may be formation of Air / Vapor pocket that may get compressed leading to rise in pressure.
  • Air / vapor pocket may explode in receiving tank leading to damage of the tank roof seal.
  • Leakage of any hydrocarbon may lead to fire or damage to environment . 
Source : http://petrofed.winwinhosting.net/upload/15-18June11/13.pdf
https://www.youtube.com/watch?feature=player_embedded&v=QAnzYVrsvBQ

Unknown

Some say he’s half man half fish, others say he’s more of a seventy/thirty split. Either way he’s a fishy bastard.

1 komentar:

  1. Underwater Pipeline: Pipeline Commissioning >>>>> Download Now

    >>>>> Download Full

    Underwater Pipeline: Pipeline Commissioning >>>>> Download LINK

    >>>>> Download Now

    Underwater Pipeline: Pipeline Commissioning >>>>> Download Full

    >>>>> Download LINK Dq

    BalasHapus